POST-WELD HEAT TREATMENT(PWHT)

POST WELD 1
previous arrow
next arrow
POST WELD  1
POST WELD 2
POST WELD 3
POST WELD 4
POST WELD 5
POST WELD 6
previous arrow
next arrow
Shadow

DESCRIPTION

The furnace for Post-Weld Heat Treatment (PWHT) was built in 2015. Having the PWHT facilities on-site has significantly reduced the associated risks entailing quality and delivery schedule when outsourcing the PWHT.

Brochure