BJCHI has both the expertise and experience in executing large-scale international modularization projects. Modularization work entails putting together steel structures, piping spools, equipment such as compressors, pressure vessels and heat exchangers, and electrical and instrumentation systems into a module as per design specifications. While modular-ization significantly cuts construction costs, helps optimize site manpower resources and overcome extreme site limitations for clients, it requires more advanced engineering, large shops and land with modularization yards strategically located near the port. BJCHI fabricates steel components in the 30-plus manufacturing shops at its main factory in Nikompattana. Then, the modularization processes are completed at one of four (4) pre-assembly and modularization yards, which are located next to Sattahip and Maptaphut ports.
| PROJECT | CUSTOMER | SCOPE | TYPE | WORK VOLUME | PERIOD |
|---|---|---|---|---|---|
| CHEMICAL AND REFINING INTEGRATED SINGAPORE PLANT PROJECT (CRISP) | EXXONMOBIL ASIA PACIFIC PTE. LTD. | MODULARIZATION | F | 23,000 | 2019-2024 |
| CHARLIE’S DECK & PLATFORM FABRICATION AND TRANSPORTATION PROJECT (BUALUANG PLATFORM) | OPHIR ENERGY PLC. | MODULARIZATION | F | 2,100 TONS | 2018 – 2019 |
| TUPI REPLICANT FPSO PROJECT | TUPI (TUPI B.V.) PETRÓLEO BRASILEIRO S.A. – PETROBRAS | MODULARIZATION | F&E | 16,500 TONS | 2015 – 2018 |
| PETROBRAS FPSO P75/P77 PROJECT | QGI BRASIL S.A. PETRÓLEO BRASILEIRO S.A. – PETROBRAS | MODULARIZATION | F | 20,000 TONS | 2014 – 2017 |
| WHEATSTONE LNG PLANT PROJECT (AUSTRALIA) | ENTREPOSE CONTRACTING | TANK FABRICATION MODULARIZATION | F | 2,300 TONS | 2014 – 2015 |
| ROY HILL IRON ORE PROJECT | LAING O’ROURKE AUSTRALIA CONSTRUCTION PTY LIMITED | CONVEYOR TRUSS, TRANSFER STATION AND ASSOCIATED COMPONENT | F | 6,000 TONS | 2014 – 2015 |
| CAPE LAMBERT PORT B PROJECT, PHASE A, B, C | LAING O’ROURKE AUSTRALIA CONSTRUCTION PTY LIMITED | CONVEYOR TRUSS, TRANSFER STATION AND ASSOCIATED COMPONENT | F | 11,800 TONS | 2012 – 2014 |
| APLNG UPSTREAM PROJECT | ORIGIN ENERGY LIMITED | NATURAL GAS PRE-TREATMENT FACILITIES (WELLHEAD SEPARATOR AND PRE-ASSEMBLY UNIT) | F | 13,000 TONS | 2011-2015 |
| FMG SOLOMON PROJECT | LAING O’ROURKE AUSTRALIA CONSTRUCTION PTY LIMITED | CONVEYOR TRUSS, TRANSFER STATION AND ASSOCIATED COMPONENT | F | 1,400 TONS | 2011 – 2012 |
| RAPID GROWTH 5 (RGP 5) PROJECT | BHP / UNITED GROUP | CONVEYOR TRUSS, TRANSFER STATION AND ASSOCIATED COMPONENT | F | 4,400 TONS | 2009 – 2010 |
| ALCAN GAS FILTER HOUSE UNIT PROJECT (AUSTRALIA) | RIO TINTO ALCAN INC. | GFH EQUIPMENT FABRICATION | F&E | 1,200 TONS | 2006 |
| ALCAN LIQUOR PURIFICATION UNIT PROJECT (AUSTRALIA) | RIO TINTO ALCAN INC. | LPU EQUIPMENT FABRICATION | F&E | 8,000 TONS | 2006 |
| ALCAN CALCINATION 661-601 PROJECT (AUSTRALIA) | RIO TINTO ALCAN INC. | CALCINATION EQUIPMENT FABRICATION | F | 8,000 TONS | 2005 |