BJCHI has both the expertise and experience in executing large-scale international modularization projects.  Modularization work entails putting together steel structures, piping spools, equipment such as compressors, pressure vessels and heat exchangers, and electrical and instrumentation systems into a module as per design specifications. While modular-ization significantly cuts construction costs, helps optimize site manpower resources and overcome extreme site limitations for clients, it requires more advanced engineering, large shops and land with modularization yards strategically located near the port. BJCHI fabricates steel components in the 30-plus manufacturing shops at its main factory in Nikompattana. Then, the modularization processes are completed at one of four (4) pre-assembly and modularization yards, which are located next to Sattahip and Maptaphut ports.

PROJECTCUSTOMERSCOPETYPEWORK VOLUMEPERIOD
CHEMICAL AND REFINING INTEGRATED SINGAPORE PLANT PROJECT (CRISP)EXXONMOBIL ASIA PACIFIC PTE. LTD.MODULARIZATIONF23,0002019-2024
CHARLIE’S DECK & PLATFORM FABRICATION AND TRANSPORTATION PROJECT (BUALUANG PLATFORM)OPHIR ENERGY PLC.MODULARIZATIONF2,100 TONS2018 – 2019
TUPI REPLICANT FPSO PROJECTTUPI (TUPI B.V.)
PETRÓLEO BRASILEIRO S.A. – PETROBRAS
MODULARIZATIONF&E16,500 TONS2015 – 2018
PETROBRAS FPSO P75/P77 PROJECTQGI BRASIL S.A.
PETRÓLEO BRASILEIRO S.A. – PETROBRAS
MODULARIZATIONF20,000 TONS2014 – 2017
WHEATSTONE LNG PLANT PROJECT (AUSTRALIA)ENTREPOSE CONTRACTINGTANK FABRICATION MODULARIZATIONF2,300 TONS2014 – 2015
ROY HILL IRON ORE PROJECTLAING O’ROURKE AUSTRALIA CONSTRUCTION PTY LIMITEDCONVEYOR TRUSS, TRANSFER STATION AND ASSOCIATED COMPONENTF6,000 TONS2014 – 2015
CAPE LAMBERT PORT B PROJECT, PHASE A, B, CLAING O’ROURKE AUSTRALIA CONSTRUCTION PTY LIMITEDCONVEYOR TRUSS, TRANSFER STATION AND ASSOCIATED COMPONENTF11,800 TONS2012 – 2014
APLNG UPSTREAM PROJECTORIGIN ENERGY LIMITEDNATURAL GAS PRE-TREATMENT FACILITIES (WELLHEAD SEPARATOR AND PRE-ASSEMBLY UNIT)F13,000 TONS2011-2015
FMG SOLOMON PROJECTLAING O’ROURKE AUSTRALIA CONSTRUCTION PTY LIMITEDCONVEYOR TRUSS, TRANSFER STATION AND ASSOCIATED COMPONENTF1,400 TONS2011 – 2012
RAPID GROWTH 5 (RGP 5) PROJECTBHP / UNITED GROUPCONVEYOR TRUSS, TRANSFER STATION AND ASSOCIATED COMPONENTF4,400 TONS2009 – 2010
ALCAN GAS FILTER HOUSE UNIT PROJECT (AUSTRALIA)RIO TINTO ALCAN INC.GFH EQUIPMENT FABRICATIONF&E1,200 TONS2006
ALCAN LIQUOR PURIFICATION UNIT PROJECT (AUSTRALIA)RIO TINTO ALCAN INC.LPU EQUIPMENT FABRICATIONF&E8,000 TONS2006
ALCAN CALCINATION 661-601 PROJECT (AUSTRALIA)RIO TINTO ALCAN INC.CALCINATION EQUIPMENT FABRICATIONF8,000 TONS2005