1) SU TU VANG 3 Units of WHRU


Client: Julong / Solar
Period: 2007
Scope of Work: Pipe
Work volume (Ton): 250

2) BLCP Ash Handling-MHI / Thailand


Client: Mitsubishi Heavy Ind.Ltd (MHI KOBE)
Period: 2005
Scope of Work: Pipe Support
Work volume (Ton): 120

3) BLCP Pipe Support-MHI / Thailand

 

Client: Mitsubishi Heavy Ind.Ltd (MHI KOBE)
Period: 2005
Scope of Work: STR
Work volume (Ton): 120

4) Talisman Off Shore / Malaysia


Client: Talisman / ME ENG’G
Period: 2005
Scope of Work: Mech.
Work volume (Ton): 280

5) Otway Off Shore / Australia


Client: Woodside / ME ENG’G
Period: 2005
Scope of Work: Mech.
Work volume (Ton): 160

6) Steam Piping in Japan Power Plant


Client: Foster Wheeler
Period: 2005
Scope of Work: Pipe
Work volume (Ton): 80

7) Lamchabang CCGT Power Plant Project


Client: Austrian Energy
Period: 2001
Scope of Work:
- Duct, Stack (280 Tons)
- STR, Trubine (2 Units)
- Bop & Piping (80 Tons)
-HRSG & Gas Turbine (1 Unit)

8) COCO Phase III Hybrid Block 1&2 Project / CO Generation


Client: Black & Veatch Limited (USA)
Period: 1999
Scope of Work:
- STR (620 Tons)
- Building Incd. Metal Sheet Work (10,200 M2)